Started the Work “Ventura”

Implanted in a strategic place, with lush trees on the banks of the Reconquista River, in front of the historic center of Tigre and on Av. Santa María de las Conchas that communicates with the Nordelta Shopping Center. A modern, transparent design of landscape apartments and large balconies, connected to the privileged environment of our land. Wide and extensive views in a residential neighborhood, with red tiles and trees, with public transport at the door, in front of Av. Liniers and close access to Panamericana and Caminos de los Remeros.

It is a residential building on the ground floor and 5 floors, it is composed of 68 functional units of 1, 2 and 3 rooms, all with balcony. It has an area of ​​3,829 m2 covered + 2,549 m2 semi-covered. The ground floor houses the access to the complex, a guard and changing room area, the service area, a swimming pool, storage spaces for bicycles, and garages for 71 vehicles.

The 1st to 3rd floor floors are the same. The 4th floor plan differs by having a larger suspended ceiling surface. The 5th floor houses 2 roof terraces equipped with a grill, service rooms and toilets.

Preliminary tasks are currently being carried out, leveling the ground, the layout of construction sites, the excavation for the tower crane base, the construction fence and the entrance circulation path.

Below we share the link for more information about the project:

Landing

Sewerage Network Expansion work began in the city of Río Cuarto (UTE Riva-Tecma)

Thousands of residents will benefit from this project, which consists of expanding and re-functionalizing the coverage area of ​​the network in the south, center and northeast of the city. To date, the excavation and installation of pipes together with their home connections began. The work began on Tucumán street, between Pje streets. Fidel Argüello and Unamuno. This section is located in sector 1 of the Alberdi neighborhood, which corresponds to item 2 (Barrio Alberdi Sewage Collection Networks).

Provisional reception Axion Energy

13/11/2020-During the first days of October, after a satisfactory approval by the client on the quality of the work carried out by Riva and having approved all the audits, we signed the provisional reception of work from the Axion service stations located on the Buenos Aires highway – La Plata. As of mid-November, the thousands of vehicles that travel the corridor, and those who circulate in the summer the route that goes to and from the coast, will be able to use the services of the building. We highlight the efforts of the entire team during this complicated and unusual year.

Work is progressing on the work of service stations for Axion

04/03/2020-Riva is currently building 2 service stations, one on each side of the Buenos Aires – La Plata Highway, Berazategui height. The work consists of 3 sectors: the CANOPY, a metal stereostructure under which the 10 fuel pumps will be installed; SHOP, made with a metal structure supported by a foundation plate and closed with a glass skin and partitions with a superboard plate, where machine rooms, changing rooms, bathrooms, cafeteria and a dining room are located; and the parking lot and landscaped sectors.

Solidarity in times of COVID-19

31/05/2020-Riva accompanies and disseminates this beautiful project that emerged through public-private articulation, in this way CooperAcción, the Tigre Cooperation and Action Table, was created with the premise of helping and containing neighbors during the coronavirus pandemic. It is a space made up of the Municipality, real estate developers, Cáritas, Judaica Norte, Fundación Avina, civil organizations, neighborhood associations, consortiums and clubs. The purpose of the initiative is to efficiently organize the arrival and distribution of donations in food, hygiene items and personal protection items destined for the most vulnerable sectors of the community.

Riva, a sustainable company

04/02/2020-The company applied to the GIRO Seal, a program launched by the Ministry of Environment and Public Space, which aims to reduce, reuse and recycle waste in the offices of the City of Buenos Aires, which he qualified from the analysis of good practices and conditions linked to the internal management of the waste generated.

Gender Violence Workshop at work

12/12/2019-Within the framework of National Law 26485, which has as main objective to prevent, punish and eradicate gender-based violence, in the Sáenz Transshipment Center, this problem was addressed together with the National Institute of Women and the Ministry of Transportation. A workshop on gender violence and complaints handling was held, which was attended by all work personnel.

Advances in the High Complexity Hospital of Santa Rosa (La Pampa)

21/11/2019-The following masonry tasks are currently underway: gutter cord over existing roadway, pump room, foundation and exterior fencing masonry, among others. Thermomechanical installation work is also being carried out: in the internment sectors, tasks of assembly and laying of hot and cold water pipes for the fan coil heating equipment of the rooms, and the assembly of ducts for heating of public spaces . In addition, the laying of medical gas pipes, which are oxygen, vacuum and compressed air pipes.

Started the work of INVAP in Agronomy – CABA

11/10/2019-The work includes the execution of the reinforced concrete structure and annexed works of the Conventional Sector – Stage N ° 1 of the Argentine Center for Proton Therapy (CEARP), where in the future radiotherapy techniques, the new proton radiation therapy will be carried out to fight cancer with advanced treatments. CEARP will be the first in the country and in Latin America. It will consist of two buildings. They, once finished, will look and functionally operate as a unique building for users.