Inauguration of the new headquarters of the General Archive of the Nation

The work team of AGN is finalizing details for the finalization and provisional delivery of the work. The volume on Rondeau Street has two floors, where the public and administrative sector is located: the first has a multipurpose room, training rooms, confectionery and public attention areas; in the second one located on the first floor, there are the offices destined for the management, administration and cataloging of documents. The tower on Pichincha Street consists of subsoil, ground floor and six floors, contains the spaces dedicated to deposits of the AGN documentary collection, the sectors of reception, cataloging and restoration of documents, personnel access and machine rooms. Currently the installation of installations is underway: electrical, thermomechanical, fire detection, sanitary, irrigation, CCTV (Closed Circuit Television) and access control. The last tasks to be carried out involve the installation of final equipment: curtains and curtains, audio, furniture, signage, alarm, landscaping and the final cleaning of the entire building.